STOCHASTIC RISK ASSESSMENT WITH A LAGRANGIAN SOLUTION FOR THE OPTIMAL COST ALLOCATION IN HIGH-SPEED RAIL NETWORKS

Stochastic Risk Assessment with a Lagrangian Solution for the Optimal Cost Allocation in High-Speed Rail Networks

In large-scale high-speed rail networks (HSRNs), the occurrence of occasional malfunctions or accidents is unavoidable.The key issue considered in this study is the optimal allocation of the maintenance costs, based on the stochastic risk assessment for HSRNs.Inspired by the theoretical risk evaluation methods in the complex network, three major fa

read more




Fallacy of paleoproductivity signals by the recycled biogenic components: case study in the Central Basin of the northwestern Ross Sea

Abstract Core LC42, retrieved from the Central Basin of the northwestern Ross Sea, contains three distinct sediment facies (IRD (ice-rafted debris)-poor bioturbated sandy mud, IRD-rich massive sandy mud, and laminated mud) that are interleaved with each other and deposited over the last 1 Ma.The biogenic components (biogenic opal, total organic car

read more